
Tutorial Task:
Following the lecture regarding concrete construction, we were given the task in class to complete a pre-cast concrete construction detail, portraying a pre-cast wall. Here, i had to add the Bondek beneath the box-gutter, the concrete pad footing, the mastic that seperates the wall from the slab. Typical additions of the C-purlins with insulation and safety mesh were also included. I learned through this lesson that pad footings actually transfer load into the bedrock below, which is far beneficial that having it transferred through unstable soils.
No comments:
Post a Comment