Tuesday, April 22, 2008

construction familiarisation_visit four







It was time to locate a new site. I was fortunate enough to find a factory construction site in East Keilor in the factory district. I happened to stumble upon this site, as it is on a road that veers off the road that gets me home from university each day. This factory was harder than the last to get a hold of, as the contractor was difficult to contact. However, after much patience, I was able to negotiate a time to access the site and witness the erection of pre-cast concrete panels.






The panels are initially poured on top of each other. I was told that every wall is poured two days apart from each other. Slots are made on the underside to allow the base of the walls to be firmly secured.








I returned to the site shortly after, and they were installing bracing rods to the walls. A crane was used to lift each wall via the wall panel eyelets. The cost of the crane was quite expensive, so the aim was to lift all the walls in one day.









After nine hours, all the walls were in place. Bracing rods were used for both the inside and outside of the factory shell. Expansion gaps were left between each wall to allow for the installation of a mastic sealant.

Week_5: Tutorial Task


Tutorial Task:


This week we were asked to complete a pre-cast and tilt-up concrete construction detail. Here, I had to add the purlins which ran across the page, a pre-cast load-bearning panel which was seperated from the slab using a mastic, and an angle which was used to connect the wall with the purlins.

Wednesday, April 2, 2008

Week_4: Tutorial Task


Tutorial Task:

Following the lecture regarding concrete construction, we were given the task in class to complete a pre-cast concrete construction detail, portraying a pre-cast wall. Here, i had to add the Bondek beneath the box-gutter, the concrete pad footing, the mastic that seperates the wall from the slab. Typical additions of the C-purlins with insulation and safety mesh were also included. I learned through this lesson that pad footings actually transfer load into the bedrock below, which is far beneficial that having it transferred through unstable soils.

Week_3: Tutorial Task

Tutorial Task:

Here, we were asked to complete a portal frame construction detail. Note that I have included C-Girts between the cladding and mullion which is fixed by a cleat fixed to it. All C-Girts are at 900 c/c max.

Construction Familiarisation_visit three

Unfortunately I was absent for the slab preparation, however I was informed by the Contractor that the laying of the slab was to be on this day. Firstly, formwork was installed around the column bases. Once the floor slab is poured, the columns are connected to the column bolts, then finally a seperate concrete pour took place.


After an inspection by the Council Building Inspector, the Contractor gives the all clear to commence the pouring of the slab.

All formwork was eventaully removed and, once it was cured, the concrete was treated with a non-stick concrete releasing agent, called 'Bond Breaker.' The agent gave the slab surface a red complextion.

Construction familiarisation_visit two



Upon my second visit to the site, the concrete was being poured into the trenches, with a piece of timber being used to level the top of the trench. A leveling float is then used to provide the trench with an even and smooth finish.
Reinforcement starter bars were added to the trench, which were to be eventually set into the concrete slab.

Construction familiarisation_visit one

Over the Easter holidays I was able to locate a proposed pre-cast factory under construction in Airport West, West Melbourne. After recieving permission by the site foreman, I was able to wander around the site and familiarise myself with commercial construction.
By the time I arrived, proposed footing trenches had already been excavated. I was informed the additional excavation took place were columns were to be positioned. While i was there, I was fortunate enough to witness the laying of trench mesh, which were held up by plastic bar chairs for support.